Mouser Left Banner
Mouser Left Banner
Mouser Left Banner
Mouser Left Banner
Mouser Left Banner
Mouser Left Banner
More

    Indian Steelmaker to Build 250 MW of Self-Consumption Solar

    Godawari Power & Ispat Ltd, an Indian integrated steelmaker, will set up a 250 MW solar plant in Raigarh district, in the Indian state of Chhattisgarh. 

    The solar project will be built on 362 hectares acquired by the company in the fiscal 2011-12 period. It will be commissioned by December 2022. The power will replace high-cost thermal and grid power and will be used for the company’s existing factory in the state’s Raipur district. 

    Currently, Godawari Power & Ispat Limited’s steel plant has a captive power generation capacity of 73 MW, including 42 MW of captive energy from waste heat recovery, 11 MW from a coal-fired thermal power plant, and 20 MW from biomass power capacity.

    Additionally, it gets 25 MW from a coal-fired thermal power plant operated by its Jagdamba Power unit and 50 MW from a solar thermal power plant in Rajasthan to meet its electricity needs.

    ELE Times Research Desk
    ELE Times Research Deskhttps://www.eletimes.com/
    ELE Times provides extensive global coverage of Electronics, Technology and the Market. In addition to providing in-depth articles, ELE Times attracts the industry’s largest, qualified and highly engaged audiences, who appreciate our timely, relevant content and popular formats. ELE Times helps you build experience, drive traffic, communicate your contributions to the right audience, generate leads and market your products favourably.

    Technology Articles

    Popular Posts

    Latest News

    Must Read

    ELE Times Top 10